Technical file preparation for Indian certification — the eleven-item BIS Scheme X document checklist

A technical file is the evidence pack that shows a product meets the standard it is certified against. For Indian certification it is not a formality — under BIS’s Scheme X, the technical file is a necessary document for grant of licence, and an application submitted without a complete one can be rejected. This guide sets out exactly what goes into one, using BIS’s own published list, then shows how the same evidence gets reused across CE, WPC and packaging compliance so you build it once instead of four times.

Document requirements below are taken from BIS’s published Scheme X guidelines and FAQs, checked on 3 November 2026. Product-specific requirements always sit in the relevant BIS Product Manual — this is the common core, not a substitute for it.

What a technical file actually is

Three ideas get used interchangeably and shouldn’t be. Test reports are laboratory results against specific clauses of a standard. A declaration of conformity is the manufacturer’s signed statement that the product complies. The technical file is the body of evidence that makes the declaration defensible: what the product is, how it is designed and built, which requirements apply, how each one was verified, and how production keeps conforming after the first sample passed.

The distinction has a practical edge. A file that is only test reports plus a certificate fails the first real question an assessor asks, which is how you know the product you ship tomorrow is the same as the one you tested. That is a quality-system question, and the file has to answer it.

The BIS technical file: eleven items

BIS sets out the contents of the technical file in its guidelines for grant of certification under Scheme X — document reference CMD-I/2:17:1 (OTR), dated 11 July 2025, issued under Schedule II of the BIS (Conformity Assessment) Regulations, 2018. Paragraph 6 lists what the file must contain:

#ItemWhat this means in practice
1Product description, with variety, grade, type or size as applicableThe commercial and technical identity of everything you want covered. Under-scoping here is what forces an inclusion application later.
2The specified requirements applicable to the productThe standard and the clauses within it. Name the current revision, including amendments.
3Photographs for identification of the productClear enough that an assessor can match the file to the item in front of them.
4Manufacturer’s name and complete addressThe actual manufacturing premises, not a head office or a trading address.
5Identification and traceability detailsBrand name, trade mark, date of manufacture, and batch, lot or serial number as applicable.
6Details of the design, including drawings as applicableAssembly and critical-component drawings, ratings, materials.
7Description of the manufacturing process as relevantProcess flow from incoming material to finished goods, with the control points.
8Product Compliance Report against all applicable specified requirementsThe substantial part. Expanded below.
9In-house quality assurance measures, including inspection and test plan and facilitiesYour scheme of inspection and testing, the equipment, and its calibration status.
10Instructions for use, maintenance, installation and safe operationThe manual as it actually ships, in the form the user receives it.
11Any other requirement specified for the productProduct Manual specifics. Always check it — this line is where they live.
Source: BIS, Guidelines for grant of certification as per conformity assessment Scheme-X, CMD-I/2:17:1 (OTR), 11 July 2025, para 6. Checked 3 November 2026.

Inside the Product Compliance Report

Item 8 is where most incomplete files are incomplete. BIS specifies that the compliance report must cover:

  • Risk assessment — hazard identification together with the risk reduction measures taken for each hazard.
  • Safety function diagrams — for example stroke limitation, electrical circuit, ground connection, hydraulic circuit and pneumatic circuit.
  • Safety validation reports, stating the performance level of safety-related parts of control systems (SRP/CS).
  • Component documents, where the report relies on component requirements such as safeguarding devices.

On risk assessment, the guidelines direct you to IS 16819 as the type A standard and to machinery-specific type C standards where one exists. The conformity demonstration has to cover all the hazards identified and the safety measures for each — a risk assessment that identifies ten hazards and evidences six is an incomplete file, and it is visibly incomplete.

What counts as acceptable component evidence

Useful to know, because it is broader than most applicants assume. For component requirements, BIS accepts any of: a BIS certificate for the component; the original manufacturer’s test certificate or data sheet; a test report from a BIS-recognised or empanelled laboratory; the applicant’s own laboratory test report, including sub-contracted testing; or an accredited laboratory test report. A supplier data sheet you already hold may be sufficient — worth checking before commissioning a test you do not need.

Who can hold the certificate, and what it covers

Three structural rules shape how you scope the work:

  • Only manufacturers can apply. BIS certifies manufacturing premises. Dealers, importers and distributors cannot hold the licence — they must buy covered products from a licensed manufacturer.
  • One application per premises, and per standard. A second factory means a second application with its own audit. A second Indian Standard means a separate application.
  • Certificates of conformity are narrower. Where a certificate of conformity is issued rather than a licence, it is valid only for a specific prototype or for a particular lot or batch — and the application must carry the quantity along with batch, lot or serial number details.

A Scheme X licence runs for an initial period of not less than three years and up to six years. Foreign manufacturers apply through the Foreign Manufacturers Certification Scheme and must nominate an Authorised Indian Representative, who must be resident in India, be at least a graduate, understand the BIS Act, 2016 and its rules and regulations, and have no conflict of interest in product compliance reporting. The representative’s name is endorsed on the certification document, and the manufacturer must keep the firm represented at all times. Relevant for overseas manufacturers filing with BIS: this nomination sits on the critical path and is routinely left until last.

The same evidence, four regimes

Most products crossing into India touch more than one approval. The overlap in the underlying evidence is substantial, which is the argument for building one master file rather than four disconnected submissions:

EvidenceBIS (ISI / Scheme X)CE markingWPC ETAPackaging / labelling
Product description, models and variantsYesYesYesYes
Design drawings and schematicsYesYesPartlyNo
Risk assessmentYesYesNoNo
Test reports against the standardYesYesYes (RF parameters)No
Manufacturing process descriptionYesPartlyNoNo
Quality plan and in-house test facilitiesYesPartlyNoNo
Labels, markings and artworkYesYesYesYes
User manual and safety instructionsYesYesNoPartly
Importer and manufacturer identity detailsYesYesYesYes
Indicative mapping of where the same evidence is reused. Each regime has its own format and sufficiency rules — confirm requirements on the relevant authority’s portal.

The practical consequence: version-control the source documents once, and generate each submission from them. Where files go wrong at scale is not that evidence is missing, but that the drawing in the BIS file and the drawing in the CE technical documentation are different revisions, and nobody noticed until an assessor put them side by side. Wireless products carry the same risk between the BIS file and the WPC ETA submission.

Why files come back

Reading BIS’s requirements against what they ask for, the recurring gaps are predictable. Check your file against these before you submit:

  • Scope too narrow. Variants, grades or sizes left out of the product description, which then need an inclusion application and a fee.
  • Superseded standard. The file cites the edition in the QCO rather than the current revision with amendments. The latest notified version applies.
  • Risk assessment without closure. Hazards identified but no documented reduction measure and no validation evidence against each one.
  • Safety-related control systems unaddressed. No stated performance level for SRP/CS where the standard requires one.
  • Calibration lapsed. In-house test equipment listed, certificates expired. An easy thing to fix beforehand and an avoidable finding during audit.
  • Address mismatch. The manufacturing premises in the file differ from the address on the application or the test reports.
  • Manual not as shipped. A draft or English-only manual in the file where the product ships with something else.
  • Traceability undefined. No stated scheme for batch, lot or serial numbering, so there is no way to connect a marked product back to a tested one.
  • Component evidence assumed. Safeguarding devices referenced with no certificate, data sheet or test report behind them.
  • Product Manual ignored. The common core assembled well, the product-specific requirements in item 11 not checked.

A build order that works

Assemble in this sequence, because each step constrains the next:

  1. Scope. Every model, variant, grade and size you want covered, and the premises each is made in. Get this wrong and everything downstream is wrong.
  2. Applicable requirements. The standards and the clauses, at the current revision. Pull the Product Manual now, not later.
  3. Design pack. Drawings, schematics, bill of materials, critical component list with their evidence.
  4. Risk assessment. Hazard by hazard, with the reduction measure and the validation against each.
  5. Testing. Only once scope and requirements are settled — testing the wrong configuration is the most expensive error available.
  6. Process and quality. Flow chart, inspection and test plan, equipment list with live calibration.
  7. User-facing documents. Manual, labels, markings, as shipped.
  8. Assemble and index. A contents page mapping each requirement to the document that evidences it. Assessors read the index first.

Frequently asked questions

What are the technical file requirements for BIS certification?

For Scheme X, BIS’s guidelines list eleven items: product description with varieties and grades, the applicable specified requirements, identification photographs, manufacturer name and address, identification and traceability details, design details and drawings, the manufacturing process description, a Product Compliance Report covering all applicable requirements, in-house quality assurance measures including the inspection and test plan, instructions for use and safe operation, and any other product-specific requirement. Product-specific additions sit in the relevant BIS Product Manual.

Is a technical file different from technical documentation?

In everyday use they describe the same thing — the evidence pack behind a conformity claim. The terminology differs by regime: European legislation generally speaks of the technical documentation or technical file, while BIS uses “technical file” for Scheme X and specifies its contents directly. What differs between regimes is format and sufficiency, not the underlying evidence.

Can an importer prepare and hold the technical file?

An importer can prepare and maintain it, and commonly does the assembly work in practice, but cannot hold a BIS licence — BIS certifies manufacturing premises, so the manufacturer is the applicant. For an overseas manufacturer the route is FMCS with an Authorised Indian Representative nominated.

Do I need a separate technical file for each product?

You need one that covers each product and each applicable standard. Related variants can usually sit within a single file if they are properly scoped in the product description, which is exactly why the scoping step comes first. Separate applications are still required per premises and per Indian Standard.

How long should I keep the file?

Keep it live for as long as the product is on the market and the certification is in force, and update it whenever the design, the components, the standard or the manufacturing location change. A file that matches the first sample but not the current production is a finding waiting to happen. Retention periods vary by regime — confirm the period that applies to yours.

Does a technical file remove the need for testing?

No. The file contains the test evidence; it does not replace it. What good documentation does is make sure you test the right configuration against the right clauses once, rather than discovering a scoping error after the laboratory invoice.

Getting help with it

Technical file preparation is the part of certification that rewards doing properly and punishes improvisation, and it is usually the slowest step for teams doing it for the first time. We prepare and review technical files for BIS ISI and Scheme X, CE marking and WPC ETA submissions, including the scoping work that decides how much testing you end up paying for.

Send us the product, the standards you think apply, and whatever documentation already exists — a review will usually tell you quickly whether the gap is evidence or just organisation. Start with our BIS ISI certification service, or get in touch with the product details.

Leave a Reply

Your email address will not be published. Required fields are marked *